BDRevise24 — English Edition

বিজ্ঞাপন

আপনার বিজ্ঞাপন এখানে — HEADER
Business

Mongla Port Faces Navigation, Jetty and Transport Challenges

Mongla Port has seen an increase in operational activities with ships arriving from the sea and cargo loading and unloading at the jetties. However, severe challenges including navigational crises, a shortage of jetties, and poor communication systems are preventing the port from reaching its full potential.

BDRevise24 Desk
Mongla Port Faces Navigation, Jetty and Transport Challenges
Photo: চ্যানেল ২৪

Mongla Port has recently experienced an increase in its operational activities as vessels continue to navigate from the sea through the river routes to reach the port. Cargo operations, including the loading and unloading of goods, are actively taking place at the port jetties, indicating a positive movement in daily maritime trade and port functionality.

Despite this operational momentum, the port is currently unable to utilize its full potential due to several persistent structural and logistical barriers. Chief among these challenges is a critical navigational crisis within the approach routes, which directly prevents larger draft vessels from safely berthing at the port facilities.

Compounding the navigation difficulties, Mongla Port is also suffering from a significant shortage of jetties. This limitation restricts the number of ships that can be accommodated simultaneously, creating bottlenecks in cargo handling and slowing down the overall maritime commerce flow through the port.

The logistical hurdles extend well beyond the immediate port boundaries, severely impacting specific export sectors. In the shrimp export industry, stakeholders are grappling with a severe shortage of suitable container and cargo ships, which is further compounded by general difficulties and suffering in the wider product transportation network.

Furthermore, the overland connectivity linked to the port remains in a substandard condition. The regional road infrastructure is characterized by narrow and dilapidated roads, which ultimately results in increased transportation times and significantly higher operational costs for businesses relying on Mongla Port for their import and export activities.

বিজ্ঞাপন

আপনার বিজ্ঞাপন এখানে — IN_ARTICLE

More in Business

See all
Bapex Begins 3D Seismic Survey in Habiganj for New Gas Field
Business

Bapex Begins 3D Seismic Survey in Habiganj for New Gas Field

Bangladesh Petroleum Exploration and Production Company (Bapex) has initiated a three-dimensional seismic survey in Habiganj's Madhabpur upazila to search for a new gas field. The survey activities will continue through June 2027 under a project that commenced in December 2025.

1 min read

বিজ্ঞাপন

আপনার বিজ্ঞাপন এখানে — FOOTER